FRA1-Mainz

Powered by green electricity, cooled with Rhine water. A green data centre is being built on the KMW premises.

Data & Facts

Location: Gaßnerallee, Mainz

Start: 05 / 2024

Completion: 12 / 2024

Use: Datacenter

GBV: 139.624 m³

Power: 54 MW

Client: Green Mountain KMW, Data Center GmbH

GP Con is constructing the first of a total of three data center buildings. Three buildings are being constructed on a site area of 25,000 square meters, which will house a total output of 80 MW on 18,000 square meters of whitespace.

In Mainz, we benefit greatly from the expertise we have acquired in the construction of numerous data centres.

Unique Features and Challenges of the Construction Process

  • High degree of parallelism between Shell&Core services and FitOut and the surrounding infrastructure work
  • Production and connection to the existing district heating network